Portfolio

Forties Alpha – Hook Up

Forties Alpha – Hook Up

Chilton Energy Centre

Chilton Energy Centre

HV and other electrical work provided for design and build of large wood processing plant and 17 NW Biomass Energy Centre.

For:
Dalkia Bio Energy Ltd
Tech:
Work on £40m sustainable Biomass Energy Centre
North Tyneside General Hospital

North Tyneside General Hospital

H.V. & L.V. Electrical Infrastructure Review. Provision of New Substation.

For:
Newcastle Hospitals
Tech:
Provision of New Substation and HV/LV work
Freeman Hospital New Energy Centre

Freeman Hospital New Energy Centre

Provision of 3No. 1875kVA Standby Generators, Essential Services, Switchboard, H.V. Switchgear, Control Systems and associated Mains Control Cabling.

For:
Dalkia Utility Services
Tech:
Work on circa £7.0m new energy centre project
James Cook University Hospital, Middlesbrough

James Cook University Hospital, Middlesbrough

Integration of 2No. 1000kVA Standby Generators to Form a ‘Common’ 5 x 1000kVA System serving the whole of the site.  Provision of new essential services Switchboard, H.V.Switchgear and Load Test Transformer.

For:
South Tees NHS Trust
Tech:
Work on £2.0m project for upgrading of generator installation
Ormskirk Hospital

Ormskirk Hospital

Upgrading of the Hospital Standby Generators and H.V. and L.V. Distribution Systems.  Provision of new H.V. & L.V. Switchgear and 2No. 1000kVA Standby Generator.

For:
Dalkia Utility Services
Tech:
Work on £1.2m project for upgrading of standby generators and HV/LV distribution systems.
Kings College Hospital – London

Kings College Hospital – London

Project  for the upgrading of the H.V and L.V. Distribution Networks and the Provision of 3No. 2000kVA Standby Generators.

For:
Dalkia Utility Services
Tech:
Upgrading of H.V. Distribution System and Standby Generating System as part of £3.0m project
Friarage Hospital, Northallerton

Friarage Hospital, Northallerton

Work on the provision of 2No. 1500kVA Standby Generators, New Standby Switchboard, Control Systems and Associated Cabling Works.

For:
South Tees NHS Trust
Tech:
Work on £1.4m generator replacement project; standby switchgear and Human Machine Interface (HMI) control system
Shotley Bridge Hospital

Shotley Bridge Hospital

Re-provision of Infrastructure including Standby Generators and other electrical work as part of an overall £8m project for Shotley Bridge Hospital.

For:
North Durham NHS Trust
Tech:
Work on part of £8m project for rationalisation and redevelopment of the existing site facilities.

Services

These are just some of the services we offer:

• HV and LV Cable Installations
• HV and LV cable Jointing and Terminations
• Switchgear and Transformer Installations
• HV Ring-main and Sub-main Installations
• Building and Installation of HV Distribution Sub-Stations
• Cable Fault Location and Repair
• Thermal Imaging Surveys of Switchgear and Ancillary Equipment
• High Voltage Pressure Testing and Commissioning
• HV Switchgear Protection System Secondary Injection Testing
• Refurbishment, Upgrades and Modifications to Existing Equipment and Systems